Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 09/15/2025
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
57A & 55  Highway Construction  East: Alternating right lane with the left lane,
Sunday 9/14/25 7:00pm-6:00am Monday 9/15/25. Monday 9/15/25 7:00pm-6:00am Tuesday 9/16/25. Tuesday 9/16/25 7:00pm-6:00am Wednesday 9/17/25. Wednesday 9/17/25 7:00pm-6:00am Thursday 9/18/25. Thursday 9/18/25 7:00pm-6:00am Friday 9/19/25.

 
Minimal  None 
57 & 57A  Bridge Construction  West: Left lane,
Wednesday 9/17/25 7:00am-1:00pm. Thursday 9/18/25 7:00am-1:00pm.

 
Minimal  None 
57 & 57A  Bridge Work  West: Right lane,
Saturday 9/13/25 7:00am-1:00pm.

 
Minimal  None 
58 & 57A  Bridge Work  West: Right lane,
Tuesday 9/16/25 10:00am-11:00am.

West: Left lane,
Tuesday 9/16/25 11:00am-12:00pm.

East: Right lane,
Tuesday 9/16/25 7:00am-9:00am.

East: Left lane,
Tuesday 9/16/25 9:00am-10:00am.

 
Minimal  None 
60 & 59  Bridge Inspection  East: Right lane,
Thursday 9/18/25 7:00am-2:00pm.

 
Minimal  None 
61 & 60  Bridge Inspection  West: Alternating right lane with the left lane,
Thursday 9/18/25 10:00am-2:00pm.

East: Alternating right lane with the left lane,
Thursday 9/18/25 7:00am-10:00am.

 
Minimal  None 


Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 09/15/2025
Buffalo/Niagara Region

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 20  Bridge Construction  South: Right lane,
Monday 9/15/25 10:00pm-6:00am Tuesday9/16/25. Tuesday 9/16/25 10:00pm-6:00am Wednesday 9/17/25. Wednesday 9/17/25 10:00pm-6:00am Thursday 9/18/25. Thursday 9/18/25 10:00pm-6:00am Friday 9/19/25. Friday 09/19/25 11:00am-6:00am Saturday 9/20/25.

 
Minimal  None 


Back to Top

Rochester Region


For The Week Starting Monday 09/15/2025
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
43 & 42  Road Work  West: Right lane,
THU 8AM-10AM

West: Right lane,
TUE 4AM-11AM

East: Right lane,
THU 5AM-7AM

 
Minimal  Weather permitting 
43 & 42  Shoulder Work  East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
WED 7AM-5PM

 
None  None 
42 & 44  Road Work  West: Right shoulder,
WED 8AM-noon

 
Minimal  Weather permitting 
44 & 42  Shoulder Work  East: Right shoulder,
TUE 7AM-5PM

 
None  None 
44 & 42  Road Work  East: Right shoulder,
WED 8AM-noon

 
Minimal  Weather permitting 
44 & 42  Shoulder Work  East: Right shoulder,
MON 7AM-5PM

 
None  None 
44 & 43  Shoulder Work  East: Shoulder,
TUE 7AM-5PM

 
None  None 
43 & 45  Paving  West: Left lane,
CONTINUOUS SUN-SAT

 
Moderate  None 
45 & 44  Paving  West: Center lane,
WED-SAT CONTINUOUS

East: Center lane,
SUN-SAT CONTINUOUS

East: Left lane,
WED-SAT 9PM-6AM & TUE-FRI 10PM-6AM

 
Moderate  None 
45 & 43  Paving  East: Right lane,
SUN-SAT Continuous

 
Moderate  None 
46 & 44  Paving  East: Left lane,
Continuous

 
Moderate  None 
46 & 45  Bridge Construction  West: Alternating right lane with the left lane,
Tuesday 9/15/25 7:00am-2:00pm.

East: Alternating right lane with the left lane,
Monday 9/15/25 7:00am-2:00pm.

 
Minimal  None 
46 & 45  Shoulder Work  East: Left lane,
Friday 9/19/25 4:00am-1:00pm, 7:00pm-12Noon Saturday 9/20/25.

West: Left lane,
Thursday 9/18/25 4:00am-2:00pm, 6:00pm-4:00am Friday 9/19/25.

East: Shoulder,
Thursday 9/18/25 6:00pm-4:00am Friday 9/19/25.

East: Left lane,
Wednesday 9/17/25 4:00am-2:00pm, 6:00pm-4:00am Thursday 9/18/25.

 
Minimal  None 
47 & 46  Shoulder Work  West: Left lane,
Tuesday 9/16/25 4:00am-2:00pm, 6:00pm-4:00am Tuesday 9/17/25.

East: Shoulder,
Tuesday 9/16/25 6:00pm-4:00am Wednesday 9/17/25.

East: Left lane,
Monday 9/15/25 4:00am-1:00pm, 6:00pm-4:00am Tuesday 9/16/25.

 
Minimal  None 


Back to Top

Syracuse Region


For The Week Starting Monday 09/15/2025
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
33 & 34  Shoulder Work  West: Shoulder,
MON-THU 7AM-5PM

 
None  None 
33 & 34  Road Work  West: Right lane,
MON-WED 8AM-1PM

 
Minimal  Weather permitting 
34 & 35  Road Work  West: Right lane,
WED 7AM-1PM

 
Minimal  Weather permitting 
35 & 34  Bridge Work  East: Alternating right lane with the left lane,
MON 5AM-11AM

 
Minimal  Weather permitting 
34A & 36  Bridge Construction  West: Left lane,
TUE 6:30AM-10AM, THU-FRI 6AM-2PM

 
Minimal  None 
35 & 36  Road Work  West: Alternating right lane with the left lane,
TUE-THU 7AM-1PM

 
Minimal  Weather permitting 
36 & 35  Bridge Construction  East: Left lane,
TUE 9AM-2PM, THU-FRI 6AM-2PM

 
Minimal  None 
41 & 40  Road Work  West: Right lane,
TUE 7:30AM-1PM

East: Right lane,
TUE 7:30AM-1PM

East: Right lane,
WED 7:30AM-1PM

East: Right lane,
TUE 7:30AM-1PM

 
Minimal  Weather permitting 
43 & 42  Road Work  West: Right lane,
THU 8AM-10AM

West: Right lane,
TUE 4AM-11AM

East: Right lane,
THU 5AM-7AM

 
Minimal  Weather permitting 
43 & 42  Shoulder Work  East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
THU 7AM-5PM

East: Right shoulder,
WED 7AM-5PM

 
None  None 
42 & 44  Road Work  West: Right shoulder,
WED 8AM-noon

 
Minimal  Weather permitting 
44 & 42  Shoulder Work  East: Right shoulder,
TUE 7AM-5PM

 
None  None 
44 & 42  Road Work  East: Right shoulder,
WED 8AM-noon

 
Minimal  Weather permitting 
44 & 42  Shoulder Work  East: Right shoulder,
MON 7AM-5PM

 
None  None 


Back to Top

Utica Region


For The Week Starting Monday 09/15/2025
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Bridge Work  East: Right lane,
Tuesday, 11:00AM - 1:00PM

East: Right lane,
Tuesday, 7:00AM - 10:00AM

East: Right lane,
Wednesday & Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
27 & 28  Bridge Construction  West: Other,
WB traffic shifted to EB side of bridge until further notice.

 
Minimal  Weather Permitting 
28 & 29  Road Work  West: Left lane,
Thursday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 
29A & 29  Road Work  East: Right lane,
MON-TUE 7AM-2PM

 
Minimal  Weather permitting 
29A & 29  Guide Rail Installation  West: Alternating right lane with the left lane,
TUE 6AM-5PM WED 6AM-3PM

West: Left lane,
MON-WED 6AM-5PM

East: Alternating right lane with the left lane,
THU 6AM-5PM, FRI 6AM-2PM

 
Minor  None 
29 & 30  Road Work  West: Right lane,
WED-THU 7AM-2PM

 
Minimal  Weather permitting 
31 & 30  Shoulder Work  East: Shoulder,
MON-THU 6:30AM-5PM

 
Minimal  None 
31 & 30  Road Work  West: Right lane,
THU 11AM-2PM

East: Right lane,
WED 7AM-11AM

 
Minimal  Weather permitting 
31 & 30  Bridge Construction  West: Left lane,
TUE-THU 7AM-5PM

West: Alternating right lane with the left lane,
MON 7AM-5PM

East: Alternating right lane with the left lane,
MON 7AM-5PM

East: Left lane,
TUE-THU 7AM-5PM

 
Minimal  None 
31 & 30  Road Work  West: Left lane,
TUE 11AM-2PM

West: Right lane,
TUE 7AM-11AM

East: Right lane,
WED 7AM-2PM

 
Minimal  Weather permitting 
31 & 32  Bridge Deck Rehabilitation  West: Right lane,
MON-SUN Continuous - EB traffic shifted to WB, Ex 31 ramp closed, detour in place.

 
Minimal  None 
33 & 31  Road Work  West: Alternating right lane with the left lane,
MON-THU 7:30AM-2PM

East: Alternating right lane with the left lane,
MON-THU 7:30AM-2PM

 
Minimal  Weather permitting 
33 & 34  Shoulder Work  West: Shoulder,
MON-THU 7AM-5PM

 
None  None 
33 & 34  Road Work  West: Right lane,
MON-WED 8AM-1PM

 
Minimal  Weather permitting 


Back to Top

Albany Region


For The Week Starting Monday 09/15/2025
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Construction  East: Other,
Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

West: Left lane,
Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
B2 & B1  Bridge Work  East: Right lane,
Thursday, 7:00AM - 2:00PM

West: Right lane,
Tuesday, 7:00AM - 2:00PM

West: Alternating right lane with the left lane,
Monday & Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Gantry Work  Direction: Interchange 25A: Alternating right lane with the left lane,
Monday - Friday, 6:00AM - 4:00PM Eastbound; Monday - Friday, 8:00AM - 5:00PM Westbound

 
None  Weather Permitting 
Ramp Work  Bridge Inspection  Direction: Interchange 25A westbound entrance ramp: Left shoulder,
Wednesday, 7:30AM - 10:00AM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 20  Other  North: Left shoulder,
Tuesday, 6:00PM - 10:00AM *Night Work*

South: Left lane,
Tuesday, 6:00PM - 10:00AM *Night Work*

 
Minimal  Weather Permitting 
20 & 21  Other  North: Right lane,
Tuesday & Wednesday, 6:00AM - 12:00 Noon

 
Minor  Weather Permitting 
21 & 21B  Road Work  North: Right lane,
Wednesday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 
21 & 21B  Other  North: Right lane,
Thursday, 7:00AM - 10:00AM

 
Minimal  Weather Permitting 
21A & 21B  Road Work  South: Right lane,
Tuesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25 & 24  Bridge Inspection  East: Right shoulder,
Monday, 9:00AM - 2:00PM

 
Minimal  Weather Permitting 
25A & 25  Bridge Inspection  East: Left lane,
Tuesday, 8:00AM - 1:00PM

 
Minimal  Weather Permitting 
26 & 27  Guide Rail Installation  West: Right lane,
Monday, 7:00AM - 12:00 Noon

 
Minimal  Weather Permitting 
27 & 26  Road Work  East: Right lane,
Wednesday, 7:00AM - 1:00PM

 
Minimal  Weather Permitting 


Back to Top

Mid-Hudson Region


For The Week Starting Monday 09/15/2025
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 16  Other  North: Alternating right lane with the left lane,
Mon 6pm-11am Tue 7pm-10am

North: Left lane,
Tue 7pm-10am

North: Left lane,
Wed 7pm-9am

North: Left lane,
Thur 8pm-7am

North: Left lane,
Fri 10pm-7am

North: Right shoulder,
Mon 6am-6pm

North: Ramp,
Alt LSH/RSH closure Tue-Wed 6am-6pm Thur 6am-7pm LSH closure Fri 6am-7pm

South: Alternating right lane with the left lane,
Sun 9pm-7am

South: Right lane,
Mon 7pm-7am

 
None  None 
18 & 16  Other  South: Alternating right lane with the left lane,
Thur 8pm-7am Fri 8pm-9am

 
None  None 
17 & 19  Bridge Inspection  North: Left lane,
8:30-10:30 Wed

North: Right lane,
10:30-12 Wed

 
Minimal  None 
19 & 18  Bridge Inspection  South: Right lane,
12:30PM-2PM Wed 10:30AM-12 Thursday

South: Left lane,
8:30AM-10:00AM Thursday

 
Minimal  None 
18 & 19  Road Work  North: Alternating right lane with the left lane,
Monday, 9:00AM - 10:00AM; Tuesday, 9:00AM - 11:00 AM; Wednesday, 6:00AM - 11:00AM

 
Moderate  Weather Permitting 
18 & 19  Bridge Construction  North: Both lanes,
NB traffic shifted to SB side of bridge until further notice.

 
Minor  Weather Permitting 
19 & 18  Road Work  South: Alternating right lane with the left lane,
Tuesday 6:00AM - 8:00AM; Wednesday - Friday, 6:00AM - 9:00AM

 
Moderate  Weather Permitting 
21 & 20  Other  North: Left shoulder,
Tuesday, 6:00PM - 10:00AM *Night Work*

South: Left lane,
Tuesday, 6:00PM - 10:00AM *Night Work*

 
Minimal  Weather Permitting 
20 & 21  Other  North: Right lane,
Tuesday & Wednesday, 6:00AM - 12:00 Noon

 
Minor  Weather Permitting 


Back to Top

New York Region


For The Week Starting Monday 09/15/2025
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Bridge Construction  Direction: Ramp E work: Ramp,
10PM-6AM Sunday

East: Right lane,
10PM-6AM Sunday

West: Right lane,
9pm-6am Sun 7pm-6am Monday-Thursday

East: Left lane,
*Exact Mileposts will vary and not exceed 3 miles* 8PM-6AM Mon-Wed 7PM-6AM (MP 8-10) Wed-Thurs

West: Right and center lanes,
11pm-6am Sun 10pm-6am Monday-Thursday

Direction: Ramp Q work: Ramp,
10PM-6AM Monday-Thursday

East: Left and center lanes,
*Exact Mileposts will vary and not exceed 3 miles* 10PM-6AM Mon-Wed 9PM-6AM (MP 8-10) Wed-Thurs

Direction: Ramp P work: Ramp,
9PM-6AM Monday-Thursday

 
None  None 
9 & 10  Bridge Construction  East: Right shoulder,
Mon-Fri 10am-3pm

 
None  None 
11 & 10  Bridge Construction  West: Right shoulder,
Mon-Thur 8am-3pm Fri 8am-2pm

 
None  None 

Garden State I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
14A & GSP  Highway Construction  South: Right lane,
8PM-6AM Monday and Thursday

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7 & 8  Bridge Construction  North: Right shoulder,
Mon-Fri 9am-3pm

 
None  None 
12 & 13  Bridge Construction  North: Right shoulder,
Mon-Thur 9am-3pm Fri 9am-1pm

 
None  None 
12 & 14  Bridge Work  North: Left lane,
Mon/Tues 8pm-6am Wed-Friday 9pm-6am

North: Left and center lanes,
Mon-Wed 10pm-6am Thurs/Fri 11am-6am

 
None  None 
14 & 13  Bridge Work  South: Right lane,
Mon-Thurs 9pm-6am Fri 9pm-6am (Sat)

South: Left and center lanes,
Mon-Thurs 11pm-5am Fri(Sat) 12am-5am

South: Left lane,
Mon- Thru 8pm-6am Fri 9pm-6am

 
None  None 
14B & 14A  Bridge Inspection  North: Right lane,
Mon-Tues 9AM-12Noon

South: Left lane,
Mon-Tues 12Noon-2PM

 
None  None 
14B & 15  Shoulder Work  North: Alternating right lane with the left lane,
Mon-Wed 6am-1pm Thurs 9am-12Noon Fri 9am-10am

North: Right shoulder,
Mon-Fri 6am-3pm

 
None  None 
15A & 14B  Shoulder Work  South: Right shoulder,
Mon-Fri 10am-3pm

 
None  None 
16 & 15  Bridge Construction  South: Right shoulder,
Mon-Fri 9am-3pm

South: Right shoulder,
Mon-Fri 9am-2pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18A & 14  Shoulder Work  North: Right lane,
Mon-Thur 7pm-7am Fri 9pm-8am Sun 10pm-7am

North: Right and center lanes,
Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am

North: Ramp,
Alt RT/LT shoulder closures: Exit 15 NB on-ramp & off-ramp Exit 16 NB on-ramp & Off-ramp Exit 17 NB off-ramp River St on-ramp to NB 95 Mon-Fri 9am-3:30pm & 7pm-7am Sun 10pm-9am

North: Right shoulder,
Mon-Fri 9am-3pm & 6pm-7am Sun 6pm-7am

South: Left and center lanes,
Mon-Wed 11pm-5:30am Thur 11pm-5am Fri 12am-6am Sun 12am-5:30am

South: Left lane,
Mon-Thur 8pm-7am Fri 9pm-9am Sun 10pm-7am

South: Right shoulder,
Mon-Fri 7am-3pm & 7pm-7am Sun 7pm-7am

South: Ramp,
Alt RT/LT shoulder closures: Exit 15 SB on-ramp & off-ramp Exit 16 SB on-ramp & Off-ramp Exit 17 SB on-ramp River St on-ramp to NB 95 Mon-Fri 7:30am-3:30pm & 7pm-7am Sun 7pm-7am

 
None  None 
19  Paving  North: Right lane,
RT LN +RSH Mon-Tue 9pm-6am

 
None  None 