Syracuse Division Projects

Future Projects

  • Syracuse Division: On-Demand Repair Contract - 2026-2027
    • Estimated Letting Year: 2025
  • MP 210 Iroquois and Indian Castle Service Area - Rehabilitate/Replace Wastewater Treatment Plant
  • MP 210 Iroquois and Indian Castle Service Area - Rehabilitate/Replace Wastewater Treatment Plant
  • East of Fulton (Exit 39, MP 289.3) to west of Weedsport (Exit 40, MP 304.5): Concrete Pavement Restoration
  • MP 266.0 Chittenango Service Area - Rehab/ Replacement Waste Water Treatment Plant
    • Estimated Letting Year: 2025
  • MP 337.0 Clifton Springs Service Area - Rehabilitation/Replace Waste Water Treatment Plant
    • Estimated Letting Year: 2026
  • Term Agreement for Construction Inspection Support Services in the Syracuse Division
    • Estimated Letting Year: 2019
  • Term Agreement for Construction Inspection Support Services - Syracuse Division
    • Estimated Letting Year: 2021
  • Canandaigua (Exit 44, MP 347.1) to Rochester (Exit 45, MP 351.4): Pavement Rehabilitation
  • Term Agreement for Construction Inpsection Support Services - Syracuse Division
    • Estimated Letting Year: 2021
  • Term Agreement for Construction Inspection Support Services - Syracuse Division ($3,000,000)
    • Estimated Letting Year: 2022
  • MP 210.62: Thruway Westbound Bridge over Little Falls Interchange Ramp (Exit 29A) - Rehabilitation
  • MP 210.62: Thruway Westbound Bridge over Little Falls Interchange Ramp (Exit 29A) - Rehabilitation
  • Term Agreement for Land Surveying and Right-of-Way Mapping Services - Syracuse and Buffalo Divisions
    • Estimated Letting Year: 2022

Go to Top | Bottom

Under Construction Projects

  • MP 304.20: Weedsport Maintenance Section - Renovations to Section Maintenance Building and Roof Replacement
    • Location: ML - MP: 304.2
    • Letting Date: 01/31/2024
    • Estimated Completion Year: 2024
    • Low Bid Amount: $1,907,200.00
    • Contract Number: TAS 23-9A / TAS24-9A/D214913
    • Contractor: Iversen Construction Corp.
    • View this project location on the map
  • Syracuse Division: On-Demand Repair Contract - 2022-2023
    • Letting Date: 10/06/2021
    • Estimated Completion Year: 2023
    • Low Bid Amount: $3,372,700.00
    • Contract Number: TAS 21-18/D214847
    • Contractor: Slate Hill Constructors, Inc.
  • MP 238.22: Thruway Bridge over Oriskany Boulevard (Route 69) - Replacement
    • Location: ORISKANY BLVD. RT. 69 Bridge
    • Letting Date: 05/29/2024
    • Estimated Completion Year: 2026
    • Low Bid Amount: $9,315,273.99
    • Contract Number: TAS 24-20B/D214978
    • Contractor: Tioga Construction Company
    • View this project location on the map
  • MP 240.48: Judd Road Bridge over Thruway - Replacement
    • Location: JUDD ROAD Bridge
    • Letting Date: 02/16/2022
    • Estimated Completion Year: 2022
    • Low Bid Amount: $4,843,934.80
    • Contract Number: TAS 22-8B/D214860
    • Contractor: Tioga Construction Company, Inc.
    • View this project location on the map
  • Syracuse Division Pavement Repairs at Various Locations 2024-2025
    • Letting Date: 01/17/2024
    • Estimated Completion Year: 2025
    • Low Bid Amount: $6,038,000.00
    • Contract Number: TAS 23-18/D214923
    • Contractor: Seneca Stone Corp.
  • Rehabilitation of Seneca River Bridge WB (MP 313.82) and Clyde Waterloo Interchange (MP 320.41)
    • Location: SENECA RIVER (WB) Bridge
    • Letting Date: 03/20/2024
    • Estimated Completion Year: 2024
    • Low Bid Amount: $2,540,037.55
    • Contract Number: TAS 24-16B/D214970
    • Contractor: Slate Hill Constructors Inc
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Rehabilitation of Seneca River Bridge WB (MP 313.82) and Clyde Waterloo Interchange (MP 320.41)
    • Location: CLYDE WATERLOO INTERCHANGE Bridge
    • Letting Date: 03/20/2024
    • Estimated Completion Year: 2024
    • Low Bid Amount: $2,540,037.55
    • Contract Number: TAS 24-16B/D214970
    • Contractor: Slate Hill Constructors Inc
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2024-2025
    • Letting Date: 10/04/2023
    • Estimated Completion Year: 2025
    • Low Bid Amount: $3,219,050.00
    • Contract Number: TAS 23-26B/D214943
    • Contractor: Slate Hill Constructors Inc
  • Mainline Bridge Rehabs (MP 227.40 & 227.41) over Sterling Creek EB & WB
    • Location: STERLING CREEK (EB) Bridge
    • Letting Date: 01/10/2024
    • Estimated Completion Year: 2025
    • Low Bid Amount: $4,770,477.00
    • Contract Number: TAS 24-5B/D214950
    • Contractor: Winn Construction Services, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • Mainline Bridge Rehabs (MP 227.40 & 227.41) over Sterling Creek EB & WB
    • Location: STERLING CREEK (WB) Bridge
    • Letting Date: 01/10/2024
    • Estimated Completion Year: 2025
    • Low Bid Amount: $4,770,477.00
    • Contract Number: TAS 24-5B/D214950
    • Contractor: Winn Construction Services, Inc.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 274.48: Shepps Corners Road - Thruway Bridge Replacement
    • Location: SHEPPS CORNERS RD Bridge
    • Letting Date: 10/04/2023
    • Estimated Completion Year: 2024
    • Low Bid Amount: $4,972,281.00
    • Contract Number: TAS 23-22B/D214931
    • Contractor: Slate Hill Constructurs
    • View this project location on the map
  • West of Canajoharie (MP 197.9) to east of Little Falls (MP 210.3): Pavement Resurfacing
    • Location: ML - MP: 197.9 to 210.3
    • Letting Date: 03/06/2024
    • Estimated Completion Year: 2024
    • Low Bid Amount: $13,749,683.25
    • Contract Number: TAS 24-14/D214969
    • Contractor: Heidelberg Materials Northeast-NY LLC
    • View this project location on the map
  • Replacement of ITS Equipment in Syracuse Division
    • Letting Date: 01/19/2022
    • Estimated Completion Year: 2022
    • Low Bid Amount: $1,423,978.00
    • Contract Number: TAS 22-2I/D214850
    • Contractor: Power & Construction Group, Inc.
  • MP 225.48 and MP 225.49: Thruway Bridges over County Road 53 - Replacements
    • Location: CO RD 53 (WB) Bridge
    • Letting Date: 11/10/2021
    • Estimated Completion Year: 2023
    • Low Bid Amount: $5,887,872.00
    • Contract Number: TAS 21-23B/D214859
    • Contractor: Bette & Cring, LLC.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)
  • MP 225.48 and MP 225.49: Thruway Bridges over County Road 53 - Replacements
    • Location: CO RD 53 (EB) Bridge
    • Letting Date: 11/10/2021
    • Estimated Completion Year: 2023
    • Low Bid Amount: $5,887,872.00
    • Contract Number: TAS 21-23B/D214859
    • Contractor: Bette & Cring, LLC.
    • View this project location on the map (Note: This is 1 of 2 locations for this project)

Go to Top | Bottom

Completed Projects

  • Syracuse Division: On-Demand Repair Contract - 2020-2021
    • Location: AUBURN ST. RT 90 Bridge
    • Letting Date: 01/23/2019
    • Completion Date: 01/06/2022
    • Construction Amount: $1,253,857.22
    • Contract Number: TAS 19-14B/D214675
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2020-2021
    • Location: PINE PLAIN-KIRKVILLE RD. Bridge
    • Letting Date: 01/23/2019
    • Completion Date: 01/06/2022
    • Construction Amount: $1,253,857.22
    • Contract Number: TAS 19-14B/D214675
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2020-2021
    • Location: HALSEY CORN. SAVANNAH RT 89 Bridge
    • Letting Date: 01/23/2019
    • Completion Date: 01/06/2022
    • Construction Amount: $1,253,857.22
    • Contract Number: TAS 19-14B/D214675
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • Syracuse Division: On-Demand Repair Contract - 2020-2021
    • Location: KINNE RD RT 298 Bridge
    • Letting Date: 01/23/2019
    • Completion Date: 01/06/2022
    • Construction Amount: $1,253,857.22
    • Contract Number: TAS 19-14B/D214675
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map (Note: This is 1 of 4 locations for this project)
  • MP 320.70 to MP 327.5:Pavement Resurfacing and MP 304.5-MP 313.1:Safety Upgrades
    • Location: ML - MP: 320.7 to 327.5
    • Letting Date: 02/16/2022
    • Completion Date: 11/04/2022
    • Construction Amount: $15,437,115.00
    • Contract Number: TAS 22-7/D214855
    • Contractor: Rifenburg Construction, Inc.
    • View this project location on the map
  • Pavement Replacement from Electronics Parkway (Exit 37, MP 284.1) to I-690 (Exit 39, MP 289.3) and Repllcement of the (MP 288.13) Thruway Bridge over CSX Railroad (Geddes) and Rehabilitation of (MP 287.11) Bridge over Onondaga Pkwy and (MP 287.25) Bridge over Onondaga Lake Outlet
    • Location: ML - MP: 284.1 to 289.3
    • Letting Date: 10/06/2021
    • Completion Date: 11/22/2023
    • Construction Amount: $88,268,426.84
    • Contract Number: TAS 21-16/D214826
    • Contractor: Harrison & Burrowes Bridge Constructors, Inc.
    • View this project location on the map
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 212
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 216.91
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 221.425
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 239.97
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 253.56
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 222.99
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 245.55
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 262.28
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 276.58
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 310.3
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 348.76
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 205.83
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 207.03
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 210.62
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 211.93
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 232.84
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.24
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.29
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.3
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 278.41
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 316.06
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 206.44
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 221.375
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 222.77
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.02
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.04
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.1
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 238.23
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019
    • Location: ML - MP: 279.79
    • Letting Date: 03/06/2019
    • Completion Date: 11/22/2021
    • Construction Amount: $3,446,350.00
    • Contract Number: TAS 19-4/D214705
    • Contractor: CCI Companies, Inc.
    • View this project location on the map (Note: This is 1 of 31 locations for this project)
  • MP 292.06: Canton Street Bridge over Thruway - Replacement
    • Location: CANTON ST Bridge
    • Letting Date: 03/09/2022
    • Completion Date: 05/31/2023
    • Construction Amount: $4,735,576.21
    • Contract Number: TAS 22-20B/D214874
    • Contractor: Slate Hill Constructors, Inc.
    • View this project location on the map