Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 07/21/2025
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
57 & 55  Highway Construction  East: Right lane,
Monday 7/21/25 7:00pm-6:00am Tuesday 7/22/25. Tuesday 7/22/25 7:00pm-6:00am Wednesday 7/23/25. Wednesday 7/23/25 7:00pm-6:00am Thursday 7/24/25.

 
Minimal  None 
57A & 55  Highway Construction  East: Left lane,
Thursday 7/24/25 7:00pm-6:00am Friday 7/25/25. Friday 7/25/25 7:00pm-6:00am Saturday 7/26/25.

 
Minimal  None 
58 & 57A  Bridge Construction  West: Right lane,
Monday 7/28/25 7:30am-11:30am.

East: Right lane,
Monday 7/28/25 7:30am-11:30am.

 
Minimal  None 
59 & 58  Other
Long Range: Silvercreek Maintenance 
East: Right lane,
Friday 7/18/25 7:00am-1:00pm.

 
Minimal  None 
58 & 59  Paving  West: Left lane,
Monday 7/7/25 6:00am-8:00pm Tuesday 7/1/25. LONG TERM CLOSURE

West: Left lane,
Tuesday 7/8/25 6:00am-8:00pm Wednesday 7/9/25. LONG TERM CLOSURE

West: Right lane,
Wednesday 7/9/25 6:00am-10:00am Thursday 7/10/25. LONG TERM CLOSURE

 
Minimal  None 
58 & 60  Road Work  West: Alternating right lane with the left lane,
Monday 7/21/25 7:00am-12:00pm Friday 7/25/25.

 
Minimal  None 
60 & 59  Road Work  East: Alternating right lane with the left lane,
Monday 7/21/25 6:00am-12:00pm Friday 7/25/25.

 
Minimal  None 
60 & 59  Bridge Construction  East: Right lane,
LONG Term Closure: Monday 7/7/25-3:00am-1:00pm Friday 7/11/25.

 
Minimal  None 
60 & 58  Road Work  East: Alternating right lane with the left lane,
Monday 7/21/25 7:00am-5:00pm Friday 7/25/25.

 
Minimal  None 
60 & 59  Bridge Construction  West: Alternating right lane with the left lane,
Monday 7/14/25 10:00am-2:00pm.

East: Alternating right lane with the left lane,
Monday 7/14/25 7:00am-10:00am.

 
Minimal  None 
61 & 59  Bridge Construction  West: Right lane,
Wednesday 7/16/25 10:00am-12:00pm.

West: Left shoulder,
Wednesday 7/16/25 8:00am-10:00am.

East: Left shoulder,
Wednesday 7/16/25 12:00pm-2:00pm.

East: Right lane,
Wednesday 7/16/25 2:00pm-4:00pm.

 
Minimal  None 
61 & 60  Bridge Construction  West: Alternating right lane with the left lane,
Tuesday 7/15/25 10:00am-2:00pm.

East: Alternating right lane with the left lane,
Tuesday 7/15/25 7:00am-10:00am.

 
Minimal  None 


Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 07/21/2025
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
57 & 55  Highway Construction  East: Right lane,
Monday 7/21/25 7:00pm-6:00am Tuesday 7/22/25. Tuesday 7/22/25 7:00pm-6:00am Wednesday 7/23/25. Wednesday 7/23/25 7:00pm-6:00am Thursday 7/24/25.

 
Minimal  None 
57A & 55  Highway Construction  East: Left lane,
Thursday 7/24/25 7:00pm-6:00am Friday 7/25/25. Friday 7/25/25 7:00pm-6:00am Saturday 7/26/25.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Bridge Work  Direction: Ramp from Busti Ave, to I-190 south CLOSED due to Bridge Repair: Ramp,
Thursday 7/10/25 9:00am-1:00pm. Ramp from Busti Ave, to I-190 south CLOSED due to Bridge Repair

 
Minimal  None 
1 & 8  Road Work  North: Left lane,
Wednesday 7/16/25 2:00am-5:00am Thursday 7/17/25. Thursday 7/17/25 10:00pm-5:00am Friday 7/18/25.

 
Minimal  None 
1 & 4  Road Work  North: Right lane,
Monday 7/14/25 10:30pm-5:00am Tuesday 7/15/25. Tuesday 7/15/25 10:30pm-5:00am Wednesday 7/16/25.

 
Minimal  None 
5 & 8  Road Work  North: Right lane,
Wednesday 7/16/25 10:30pm-2:00am Thursday 7/17/25.

 
Minimal  None 
20 & 21  Bridge Construction  North: Right lane,
Monday 7/21/25 10:00pm-6:00am Tuesday 7/22/25. Tuesday 7/22/25 10:00pm-6:00am Wednesday 7/23/25. Wednesday 7/23/25 10:00pm-6:00am Thursday 7/24/25. Thursday 7/24/25 10:00pm-6:00am Friday 7/25/25.

 
Minimal  None 
21 & 20  Bridge Construction  South: Left lane,
Friday 7/11/25 10:00pm-8:00am Saturday 7/12/25.

 
None  None 


Back to Top

Rochester Region


For The Week Starting Monday 07/21/2025
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
43 & 42  Road Work  East: Left lane,
FRI/SAT 9PM-8AM

 
Minimal  Weather permitting 
43 & 45  Road Work  West: Left lane,
Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25.

 
Minimal  None 
45 & 43  Paving  West: Left lane,
SUN-SAT CONTINUOUS

East: Right and center lanes,
MON-WED 9PM and THU FRI 10PM to TUE-SAT 6AM

 
Moderate  None 
45 & 43  Road Work  East: Center lane,
Monday 7/7/25 9:00pm-6:00am Tuesday 7/8/25. Tuesday 7/8/25 9:00pm-6:00am Wednesday 7/9/25. Wednesday 7/9/25 9:00pm-6:00am Thursday 7/10/25. Thursday 7/10/25 9:00pm-6:00am Friday 7/11/25. Friday 7/11/25 9:00pm-6:00am Saturday 7/12/25.

 
Minimal  None 
44 & 45  Road Work  West: Ramp,
Right lane of exit ramp. Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25.- Right Ramp

 
Minimal  None 
44 & 45  Paving  West: Ramp,
MON-SAT Rt Decel CONTINUOUS

 
Moderate  None 
46 & 45  Highway Construction  East: Right lane,
RAMP CLOSURE Wednesday 7/23/25 8:00pm-6:00am Thursday 7/24/25. Thursday 7/24/25 8:00pm-6:00am Friday 7/25/25.- Rain Date if needed

 
Minimal  None 
45 & 46  Paving  West: Right lane,
Tuesday 7/22/25 6:00pm-8:00am Wednesday 7/23/25.

 
Minimal  None 
46 & 43  Paving  East: Left lane,
SUN-SUN 6AM

 
Moderate  None 
46 & 43  Road Work  East: Left lane,
Sunday 7/6/25 6:00am-6:00am Sunday 7/13/25.

 
Minimal  None 
45 & 46  Paving  West: Left shoulder,
Monday 7/21/25 7:00am-3:00pm.

West: Right lane,
Wednesday 7/23/25 6:00pm-8:00am Thursday 7/24/25.

East: Right lane,
Monday 7/21/25 6:00pm- 9:00am Tuesday 7/22/25.

West: Left shoulder,
Tuesday 7/22/25 7:00am-3:00pm.

West: Right lane,
Thursday 7/24/25 7:00pm-8:00am Friday 7/25/25.

 
Minimal  None 
46 & 45  Bridge Work  East: Right lane,
Tuesday 7/22/25 7:30-12:00pm

 
Minimal  None 
45 & 46  Paving  West: Left shoulder,
Wednesday 7/23/25 7:00am-3:00pm. Thursday 7/24/25 7:00am-3:00pm. Friday 7/25/25 7:00am-3:00pm.

West: Right lane,
Friday 7/25/25 8:00pm-8:00am Saturday 7/26/25.

 
Minimal  None 
46 & 47  Bridge Work  West: Right lane,
Monday 7/21/25 9:30am-12:00pm.

 
Minimal  None 


Back to Top

Syracuse Region


For The Week Starting Monday 07/21/2025
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Road Work  Direction: Exit 37 WB D Ramp: Ramp,
THU 7AM-2PM

 
Minimal  Weather permitting 
32 & 34  Other  West: Shoulder,
MON-THU 7AM-5PM

 
Minimal  None 
32 & 34  Road Work  West: Right lane,
MON-THU 7:30AM-2PM

 
Minimal  Weather permitting 
34 & 33  Road Work  East: Right shoulder,
TUE-THU 5AM-10AM

West: Right lane,
TUE-THU 5AM-10AM

West: Right lane,
TUE-WED 4AM-noon

East: Right shoulder,
TUE-THU 7:30AM-2PM

 
Minimal  Weather permitting 
36 & 34A  Road Work  East: Alternating right lane with the left lane,
TUE-WED 7AM-2PM

 
Minimal  Weather permitting 
36 & 35  Road Work  East: Right lane,
TUE 7AM-2PM

 
Minimal  Weather permitting 
36 & 35  Bridge Construction  East: Left lane,
TUE 9AM-2PM, WED 9AM-1PM

 
Minimal  None 
41 & 40  Road Work  East: Right lane,
WED 5:30AM-10:30AM

East: Right lane,
TUE 5:30AM-10:30AM

East: Left shoulder,
MON 7:30AM-2PM

 
Minimal  Weather permitting 
42 & 40  Road Work  East: Right lane,
TUE 5:30AM-10AM

 
Minimal  Weather permitting 
41 & 42  Road Work  West: Right lane,
TUE-WED 5:30AM-9AM

 
Minimal  Weather permitting 
43 & 42  Road Work  East: Left lane,
FRI/SAT 9PM-8AM

 
Minimal  Weather permitting 


Back to Top

Utica Region


For The Week Starting Monday 07/21/2025
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Bridge Inspection  East: Alternating right lane with the left lane,
Tuesday, 7AM - 1PM

 
Minimal  Weather Permitting 
27 & 28  Bridge Construction  West: Other,
WB traffic shifted to EB side of bridge until further notice.

 
Minimal  Weather Permitting 
27 & 29  Conduit Work  West: Left shoulder,
Monday - Thursday, 7AM - 5PM

 
None  Weather Permitting 
28 & 31  Other  West: Shoulder,
MON-FRI 7AM-5PM

 
None  None 
29A & 28  Bridge Inspection  West: Right lane,
Wednesday, 7AM - 10AM

West: Left lane,
Thursday, 7AM - 10AM

East: Right lane,
Wednesday, 10AM - 1PM

East: Left lane,
Thursday, 10AM - 1PM

 
Minimal  Weather Permitting 
29A & 29  Road Work  East: Right lane,
Monday, 7AM - 1PM

 
Minimal  Weather Permitting 
29 & 29A  Guide Rail Installation  West: Right lane,
THU 6AM-5PM

West: Right lane,
MON-THU 6AM-5PM

West: Right lane,
MON-WED 6AM-5PM

 
Minor  None 
29 & 30  Guide Rail Installation  West: Right lane,
FRI 6AM-11AM

 
Minor  None 
30 & 29A  Road Work  East: Right lane,
TUE-THU 7AM-2PM

 
Minimal  Weather permitting 
31 & 29A  Bridge Construction  East: Right lane,
TUE-THU 6AM-4PM

 
Minimal  None 
30 & 31  Road Work  East: Right lane,
WED-THU 7AM-2PM

West: Right lane,
TUE 7AM-2PM

 
Minimal  Weather permitting 
31 & 32  Bridge Deck Rehabilitation  West: Right lane,
WED 24 hrs.

 
Minimal  None 
32 & 31  Road Work  East: Alternating right lane with the left lane,
TUE-THU 7:30AM-2PM

 
Minimal  Weather permitting 
31 & 32  Other  West: Shoulder,
MON-TUE 7AM-5PM

West: Shoulder,
MON 3PM-5PM

 
Minimal  None 
31 & 32  Road Work  West: Right lane,
TUE-THU 7:30AM-2PM

 
Minimal  Weather permitting 
33 & 31  Road Work  West: Left shoulder,
MON-THU 7:30AM-2PM

East: Left shoulder,
MON-THU 7:30AM-2PM

 
Minimal  Weather permitting 
32 & 33  Other  West: Shoulder,
MON-THU 7AM-5PM

 
Minimal  None 
32 & 34  Other  West: Shoulder,
MON-THU 7AM-5PM

 
Minimal  None 
32 & 34  Road Work  West: Right lane,
MON-THU 7:30AM-2PM

 
Minimal  Weather permitting 
34 & 33  Road Work  East: Right shoulder,
TUE-THU 5AM-10AM

West: Right lane,
TUE-THU 5AM-10AM

West: Right lane,
TUE-WED 4AM-noon

East: Right shoulder,
TUE-THU 7:30AM-2PM

 
Minimal  Weather permitting 


Back to Top

Albany Region


For The Week Starting Monday 07/21/2025
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Bridge Construction  East: Other,
Monday - Sunday, 12:00 MIDNIGHT - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

West: Left lane,
Monday - Sunday, 12:00 Midnight - 12:00 Midnight *24-Hour Closure* EB traffic shifted to WB side of bridge until further notice.

 
Minimal  Weather Permitting 
B1 & B2  Road Work  East: Left lane,
Monday, 7AM - 11AM; Thursday, 7AM - 12NOON

 
Minimal  Weather Permitting 
B2 & B1  Bridge Inspection  East: Left lane,
Wednesday, 7AM - 10AM

West: Left lane,
Tuesday, 10AM - 2PM

West: Right lane,
Tuesday, 7AM - 10AM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Gantry Work  Direction: Interchange 25A: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 5:00PM

Direction: Interchange 25: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 5:00PM

 
None  Weather Permitting 
Interchange Work  Ramp Work  Direction: Interchange 24- EB D-Ramp Guiderail Repair: Left lane,
Tuesday - Thursday, 10PM - 5AM *NIGHT WORK*

Direction: Interchange 24- WB A-Ramp Guiderail Repair: Left lane,
Tuesday - Thursday, 10PM - 5AM *NIGHT WORK*

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 20  Road Work  South: Left lane,
Tuesday, 2AM - 10AM

 
Minimal  Weather Permitting 
21A & 21B  Bridge Work  South: Right lane,
Thursday, 12MIDNIGHT - 8AM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25A  Road Work  West: Right lane,
Tuesday - Thursday, 9:00AM - 12NOON *Mobile Maintenance*

 
Minimal  Weather Permitting 
24 & 25A  Ramp Work  West: Left lane,
Wednesday - Thursday, 8:00AM - 12:00NOON

 
Minimal  Weather Permitting 
25 & 24  Road Work  East: Right lane,
Tuesday - Wednesday, 9:30AM - 1:00PM * Mobile Maintenance*

 
Minimal  Weather Permitting 


Back to Top

Mid-Hudson Region


For The Week Starting Monday 07/21/2025
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
17 & 16  Other  South: Right lane,
Tue-Wed 6pm-7am

South: Right lane,
Mon 7pm-7am

South: Left lane,
Fri 8pm-9am

South: Left lane,
Thur 7pm-7am

South: Left lane,
Wed 6pm-7am

 
None  None 
18 & 19  Road Work  North: Right lane,
Monday, 4AM - 7AM; Tuesday, 4AM - 10AM; Wednesday - Friday, 4AM - 7AM

 
Minimal  Weather Permitting 
18 & 19  Bridge Construction  North: Both lanes,
NB traffic shifted to SB side of bridge until further notice.

 
Minor  Weather Permitting 
19 & 18  Road Work  South: Right lane,
Monday, 4AM - 9AM; Tuesday - Thursday, 4AM - 11AM; Friday, 4AM - 10AM

 
Minimal  Weather Permitting 
19 & 18  Road Work  South: Right lane,
Monday, 4AM - 9AM; Tuesday - Thursday, 4AM - 11AM; Friday, 4AM - 10AM

 
Minimal  Weather Permitting 
21 & 20  Road Work  South: Left lane,
Tuesday, 2AM - 10AM

 
Minimal  Weather Permitting 


Back to Top

New York Region


For The Week Starting Monday 07/21/2025
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
9A & 11  Paving  East: Left lane,
Mon-Thur 8pm-6am Sun 10pm-6am

East: Left and center lanes,
Mon-Thur, Sun 10pm-6am

 
None  None 
9 & 10  Paving  East: Ramp,
Ramp F Sun, Wed 10pm-6am

East: Ramp,
Ramp G Thur 10pm-6am

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
3 & 5  Bridge Inspection  North: Right lane,
Rt LN +RSH+RDL Wed 9am-12pm

 
None  None 
12 & 14  Bridge Work  North: Left lane,
Mon-Tue 8pm-7am Wed-Thur 9pm-7am Fri 10pm-7am

North: Left and center lanes,
Mon-Tue 11pm-6am Wed-Fri 12am-6am

 
None  None 
14 & 13  Bridge Work  South: Right lane,
Mon-Wed 8pm-6am Thur 9pm-6am

South: Left and center lanes,
Mon-Wed 11pm-5am Thur 12am-5am

South: Left lane,
Mon-Wed 8pm-6am Thur 9pm-6am

 
None  None 
14B & 15A  Bridge Inspection  North: Right lane,
RT Partial Decel Mon-Wed 7am-11am

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
8B & 10  Road Work  North: Right and center lanes,
Mon-Wed 11:30pm-5:30am Thurs 12am-5am Fri 12:30am-6am

North: Right lane,
Mon-Thur 9pm-6am Fri 10pm-6am

 
None  None 
13 & 8C  Road Work  South: Right and center lanes,
Mon-Wed 11pm-5:30am Thurs 12am-5am Fri 12am-6am

South: Right lane,
Mon-Thur 9pm-6am Fri 10pm-6am

 
None  None 
18A & 14  Shoulder Work  North: Right lane,
Mon-Thur 7pm-7am Fri 9pm-8am

North: Right and center lanes,
Mon-Thur 11pm-5:30am Fri 12am-6am

North: Right shoulder,
Mon-Fri 9am-3pm & 6pm-7am

North: Ramp,
Alt RT/LT shoulder closures: Exit 15 NB on-ramp & off-ramp Mon-Fri 9am-3:30pm, 7pm-7am Exit 16 NB on-ramp & Off-ramp Mon-Fri 9am-3:30pm, 7pm-7am Exit 17 NB off-ramp Mon-Fri 9am-3:30pm, 7pm-7am River St on-ramp to NB 95 Mon-Fri 9am-3:30pm, 7pm-7am

South: Right and center lanes,
Mon-Thur 11pm-5:30am Fri 12 am-6am

South: Right shoulder,
Mon-Fri 7am-3pm & 7pm-7am

South: Ramp,
Alt RT/LT shoulder closures: Exit 15 SB on-ramp & off-ramp Mon-Fri 7:30am-3:30pm, 7pm-7am Exit 16 SB on-ramp & Off-ramp Mon-Fri 7:30am-3:30pm, 7pm-7am Exit 17 SB on-ramp Mon-Fri 7:30am-3:30pm, 7pm-7am River St on-ramp to NB 95 Mon-Fri 7:30am-3:30pm, 7pm-7am

South: Right lane,
Mon-Thur 8pm-7am Fri 9pm-8am

 
None  None 